CONSTRUCTION CONTRACT
Construction of the two more units on this existing logistics park. The two warehouses included dock levellers and retaining walls for which we provided the precast housing. Client for this job was First Industrial.
PROPORTION OF PROJECT UNDERTAKEN
All of the precast dock leveller housing and external retaining walls.
FUNCTION / ROLE
We provided a full design/coordination/detailing service for the precast elements from receipt of the Architects and Engineers drawings. Once this was done and approved by the Client we then manufactured the elements in our carousel factory, delivered them to site and fitted the panels with our own crews plus we also had visiting project management on site.
PRECAST ELEMENTS REQUIRED
200mm Twinwall
300mm Twinwall
100mm Floor slab
300mm KC Wall
VALUE
Value of firm’s commission/contract: £95K
Construction Contract value: £15M
DESIGN TEAM
Architect: Michael Sparks Associates
Engineer: BWB Consulting
GENERAL
Contracting Authority name: Buckingham Group Contracting