Construction contract:
Manufactured and delivered to site the shear core walls for all the structure plus walls to the plant room area.
Function/role of Firm in delivery of project:
We provided a full design/coordination/detailing service for the precast elements from receipt of the Architects and Engineers drawings. Once this is was done and approved by the Client. We then manufactured the elements in our carousel factory, delivered them to site. Supply only.
Proportion of Project undertaken:
Core and ground floor walls.
Precast elements required:
TW 200mm for core
TW 180mm Ground floor to plant room
VALUE
Construction Contract value: £1.1m
Value of firm’s commission/contract: £86k
DESIGN
Architect: Bond Bryan
Engineer: Price and Myers
GENERAL INFORMATION
Contracting Authority name: O’Keefe’s
Contracting Authority address:
St Andrew’s House, 1 Dreadnought Street, Greenwich, London, SE10 0PU
Contracting Authority contact name: Vasiliki Geitona Phone: (01) 465 9945