Construction contract:
Supply and fit Twin walls
Function/role of Firm in delivery of project:
We provided a full design/coordination/detailing service for the precast elements from receipt of the Architects and Engineers drawings. Once this is was done and approved by the Client. We then manufactured the elements in our carousel factory, delivered them to site and installed the units. We also supervised and controlled the erection to ensure programme and quality is met.
Proportion of Project undertaken:
Supplied complete perimeter wall
Precast elements required:
PCC TW 325mm
VALUE
Construction Contract value: €25m
Value of firm’s commission/contract: €142k
DESIGN
Architect: STOAS
Engineer: Craddys
GENERAL INFORMATION
Contracting Authority name: DSP Construction Management Ltd,
Contracting Authority address: 205 Fort Dunlop, Fort Parkway, Birmingham, B24 9FD
Contracting Authority contact name: Jonny Poland, Phone: +44 52 915 2166