CONSTRUCTION CONTRACT
Student Accommodation, Fabian Way Swansea Bay.
To provide the shell works of the 12No. Buildings comprising 1000No. Student beds for the new science campus of Swansea University.
PROPORTION OF PROJECT UNDERTAKEN
The entire shell works of 12No. Buildings ranging in height from 3No. to 12No stories.
FUNCTION / ROLE
We provided the full design/coordination/detailing service for the precast elements from receipt of the Architects and Engineers drawings. Once this was done and approved by the Client we then manufactured the elements in our carousel factory, delivered them to site and installed the units. We also provided the erection crews, cranes and supervisors to control the erection to ensure programme and quality is met.
PRECAST ELEMENTS REQUIRED
180mm Twin Wall
200mm Twin Wall
300mm Twin Wall
70mm Filigree Floor Plate
VALUE
Value of firm’s commission/contract: £8.0M
Construction Contract value: £450M
DESIGN TEAM
Architect: Glancy Nichols, Birmingham.
Engineer: Bingham Hall Ptrship.
GENERAL
Contracting Authority name: Vinci Construction Ltd. UK