The new hall of residence was located immediately adjacent to the 2000No. beds previously erected by us and provided 450No. more beds arranged in to 49 ‘flats’ ranging in size from 6-11 rooms. All constructed for Swansea University.
All of the precast shell works encompassing the internal and external walls plus the slabs.
We provided a full design/coordination/detailing service for the precast elements from receipt of the Architects and Engineers drawings. Once this was done and approved by the Client we then manufactured the elements in our carousel factory, delivered them to site and fitted the panels with our own crews plus we also had full time project management based on site.
200mm Twinwall
320mm KC Wall (100mm insulation)
70mm filigree slabs